Civil and Surfacing Works - Estate Property, Haddington

Location: Whittingehame House, Haddington
Project: All Civil and Surfacing works for turnkey project
Duration: 7 Days

We are Civil & Surfacing Contractors covering Lothians, Borders, Northumberland and Cumbria.

This is a recent project where we were proud to be the chosen contractor to carry out all civil & surfacing works at this stunning 1817 estate property. This turnkey project was completed over 7 days and involved:

  • Removing the existing disintegrated surface
  • Reducing levels to improve drainage flow
  • Installing a new drainage system to effectively collect surface water
  • To complement the character of the property, reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds, creating a softer and more traditional finish against the building
  • The project was completed using 10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm

If you have a similar project, large or small, our team is here to help. We provide professional services for both domestic & commercial clients across Scotland and the North of England. Contact us today for a free, no obligation quotation. See more of Our Work here.

Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface
Removing the existing disintegrated surface

Reducing levels to improve drainage flow - Installing a new drainage system to effectively collect surface water
Reducing levels to improve drainage flow - Installing a new drainage system to effectively collect surface water
Reducing levels to improve drainage flow - Installing a new drainage system to effectively collect surface water
Reducing levels to improve drainage flow - Installing a new drainage system to effectively collect surface water
Reducing levels to improve drainage flow - Installing a new drainage system to effectively collect surface water

Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow
Reducing levels to improve drainage flow

reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds
reclaimed Edinburgh cobbles were installed around the lawn perimeter along with new gravel beds

10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm
10mm SMA & 20mm base course tarmac, with a total tarmac construction depth of 200mm