Location: Spittal-On-Rule, Hawick, Borders, Scotland.
Project: Tarmac Farm Road, Stables Area, Parking and Site.

Phase 1 completed of surfacing works carried out for one of our oldest customers in Spittal-On-Rule, Hawick, Borders, Scotland. Another early start for the team for this one. Here’s a list of the main project tasks involved:
– Surface stripped back and removed
– 300mm of type-1 sub base laid to new levels
– concrete kerb edging stones around the perimeter
– 75mm depth of AC20mm base course tarmac
– 55mm depth of AC10mm stone mastic asphalt

Firstly, here’s a look at the old surface and the boys carrying out some surface stripping

surface stripping
surface stripping
surface stripping
surface stripping
surface stripping

Sub base was then laid to new levels. We lay a 300mm type-1 sub base to ensure a proper foundation in formed.

300mm type-1 sub base to ensure a proper foundation
300mm type-1 sub base to ensure a proper foundation

Concrete edging, base course tarmac and stone mastic asphalt is then laid, rolled and sealed.

base course tarmac and stone mastic asphalt is then laid, rolled and sealed_1
base course tarmac and stone mastic asphalt is then laid, rolled and sealed_1
base course tarmac and stone mastic asphalt is then laid, rolled and sealed_1

Some pictures of the finished project.

Tarmac Stables, Farm Road Completed Work
Tarmac Stables, Farm Road Completed Work
Tarmac Stables, Farm Road Completed Work