This project called for the installation of a new tarmac road for a shared access to several properties in Morpeth, Northumberland. As you can see from the images below, the existing surface was very poor and in need of an upgrade.
![]()
![]()
![]()
The old surface was excavated and removed before laying the new surface levels which consisted of:
– Type-1 hardcore stone laid to new levels
– 20mm Base course laid at 60mm depth
– 14mm Carpave wearing course laid at 40mm depth
![]()
![]()
![]()
![]()
![]()
Have a look at the finished project below. If you like what you see and have a similar project don’t hesitate to get in touch.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()